TM&L

Industrial sector

Your plant wasn’t designed to live off the grid.

Production line, presses, CIP systems, climate control. Each voltage dip costs you scrap, delays, and corrective maintenance. Your backup needs to be part of your process, not an emergency.

What you already know

The problems you face in industrial.

We're not going to explain your business to you. These are the spots where mediocre power backup costs you money every month.

Grid outages impact production

In Costa Rica, outages are short but frequent. 30 seconds without power and your line is down for 30 minutes.

Machinery sensitive to transients

PLCs, drives, robots. A dirty drop resets them and forces recalibration. Hidden cost per event.

High peak-hour costs

Operating between 5–8 pm costs you up to 3x more. If you could disconnect from the grid at peak, real savings.

Quality audits and certification

ISO, FSSC, clients that audit. You need records, certificates, and documented backup of your power.

How TM&L solves it

What changes when you work with a technical partner.

Recommended capacities: 100 to 500 kVA depending on connected load and operation regime.

01

Automatic transfer switch (ATS)

When the grid drops, the generator picks up load in under 10 seconds. Your PLCs don't even notice.

02

Strategic peak-hour operation

We schedule the generator to take load at peak rate. Cut up to 40% of monthly energy cost.

03

Scheduled preventive maintenance

Service scheduled during planned downtime. Zero interruptions for inspection.

04

Audit-ready documentation

Digital logbook, compliance certificates, technical reports. Ready for the next auditor.

Let's talk

If your plant can't afford another outage, let's talk.

Tell us the basics. We respond today with a proposal for your operation.

1 / 3

What type of operation do you run?

Other sectors

Run in more than one?